#BikeNite A8 I've made a few crossings of the river near sunset this week, returning from #BikeSummerPDX group rides, and passed 600 miles on the #lectricOne, after about six months. I'm still not happy with their programming choices / inflexibility relative to the throttle and assist levels (🙄 "annoying if you ever pedal" ™️.) Still far less happy with #OregonDOT, owner of the ugly Marquam bridge (is falling down) and all of the worst #stroads in #Portland. #ODOTGTFOpdx #eBikes #BikeTooter

Freeway bridge ruining a lovely skyline
ALT
600 miles happened on Barbur Blvd (ODOT stroad) at 25mph on the viaducts with no bike lanes
ALT
Jul 4, 2026, 00:47 UTCen