Replying to @xabean@infosec.exchange

Okay, I did a woodwork. Well, actually a woodcut.

An incredibly wasteful woodcut. I found a second sheet of 3/4" plywood, and cut everything again, then somehow again fucked up cutting up the middle third huge division of the sheet (which had parts A, B, C and D) which meant that everything was too long, and I ran out of plywood to pull out the parts that make the feet, D.

Measure twice, cut twice, even try to sketch the plan onto the plywood with pencil, T-square, and tape measure and still fuck it up.

This is me making my own slightly taller version of fixthisbuildthat.com/how-to-bu because the plans as-is block my G1023RLWX dust extraction port. So mine has longer legs, no wheels, and the bottom shelf will be 10" off the ground.

Piles of cut plywood in stacks, labeled A through G all IKEA like.  Just have to assemble it into a table saw outfeed table.
ALT
My open cut list cutting diagram for dividing up the 4'x8' sheet of plywood.  It's a bunch of rectangles packed really efficiently, using 90% of the sheet of plywood to make one project.
ALT
Jul 5, 2026, 23:13 UTCen